Vendor: Honeywell

Honeywell 51198873-100 Shielded I/O Link Cable

SKU: 51198873-100
In stock
Description

Honeywell 51198873-100 Shielded I/O Link Cable

The Honeywell 51198873-100, also cataloged as the 51198873-100 shielded I/O link cable, serves as a dedicated interconnection for stable signal transmission between I/O modules, field termination assemblies, and process equipment in Experion PKS distributed control systems.

Hardware Specifications

Parameter Specification
Model 51198873-100
Brand Honeywell
Origin USA
Weight Not specified
Dimensions Standard length 30.48 m (100 ft); optional 300 m reels
Operating Temp -40 to +70 deg C
Power Consumption Passive cable assembly
Core Function Shielded I/O link cable for module-to-FTA interconnection
Jacket Material Polyurethane (PU), abrasion and chemical resistant
Isolation High-density shielding for EMI/RFI suppression
Application Experion PKS, industrial automation environments

Channel-to-Channel Isolation

The cable incorporates high-density shielding to suppress EMI and RFI across multiple signal paths. This design ensures channel-to-channel isolation, preventing interference between adjacent I/O signals. Polyurethane jacketing provides mechanical durability and chemical resistance, supporting continuous-duty operation in harsh industrial environments.

Frequently Asked Questions

Q: Can the 51198873-100 cable be field-cut and terminated? A: No, it is supplied in fixed lengths or reels; termination must follow Honeywell-approved assemblies to maintain shielding integrity.

Q: What is the minimum bend radius during installation? A: Follow standard industrial cable practices; avoid sharp bends to prevent conductor fatigue and shielding damage.

Q: Is the cable interchangeable with non-Honeywell shielded cables? A: Substitution is not recommended; impedance and shielding specifications are tuned for Honeywell DCS systems.

Field Installation Guidelines

  • Route the cable in designated trays or conduits to minimize mechanical stress.
  • Ground shielding at a single point to prevent ground loop formation.
  • Avoid parallel routing with high-voltage lines to reduce induced noise.
  • Maintain bend radius per Honeywell installation standards.
  • Inspect polyurethane jacket integrity before energizing the system.